Surgutskaya GRES-1

Surgutskaya GRES-1 is located in Surgut, Tyumen Region and is a part of the Ural UPS.

Surgutskaya GRES-1 is one of the largest power plants in the Russian Federation in terms of installed electric capacity.

The main competitors of Surgutskaya GRES-1 include Nizhnevartovskaya GRES (JSC “INTER RAO – Electric Power Plants”), Surgutskaya GRES-2 (JSC E.ON Russia) and Nyaganskaya GRES (JSC “Fortum”).

Compared to its rivals, Surgutskaya GRES-2 has the least flexibility, but the installed capacity of each of our competitors’ power units is four times higher than the installed capacity of each power unit at Surgutskaya GRES-1. 

3 333
MW.
installed
electric
power
903
Gcal/h
Installed
heat
capacity
921
Employees
Main
fuel:
natural gas
The primary fuel for the power plant is natural gas. There is no reserve fuel; the starting fuel is gas.
The composition of the main equipment

Installed electric capacity is 3,268 MW

Installed heat capacity is 903 Gcal/h

Key figures for 2014

Electricity output, million kWh

21,615

Electricity sales, million kWh

22,047

Heat supply, thousand Gcal

1,656

CF, %

75,5

SCEF, gef/kWh

321,8

Headcount

927

Fuel mix and fuel consumption in 2014

Fuel mix, % Fuel consumption

Gas

100.0 5,927 million m3

Coal

Diesel fuel

0 0 thousand tons