Novocherkasskaya GRES

Novocherkasskaya GRES is located in the Donskoy settlement, Rostov Region.

The plant’s primary fuel is ASH-grade coal from the Rostov coal basin (Almaznaya, Chikh and Sadkinskaya mines, Gukovugol, and Sherlovskaya-Naklonnaya mine), Kuznetsk coal (Kaltansky and Krasnobrodsky strip mines) and natural gas. The reserve fuel is gas; the starting fuel is gas and fuel oil.
Novocherkasskaya GRES is a part of the Southern UPS, and its main competitors are Nevinnomysskaya GRES (JSC Enel OGK-5) and Rostov NPP (JSC Concern Rosenergoatom). Peak regulation is handled by Tsimlyanskaya HPP (JSC Southern Generating Company – TGK-8).
The plant has no seasonal nature of power limitation.
2 258
MW.
installed
electric
power
60
Gcal/h
Installed
heat
capacity
1080
Employees
Main
fuel:
Coal
The composition of the main equipment

Installed electric capacity is 1,884 MW

Installed heat capacity is 60 Gcal/h

Key figures for 2014

Electricity output, million kWh

10,797

Electricity sales, million kWh

11,254

Heat supply, thousand Gcal

83

CF, %

65

SCEF, gef/kWh

367.9

Headcount

1,156

Fuel mix and fuel consumption in 2014

 

Fuel mix, %

Fuel consumption

Gas

33.3 1,070 million m3

Coal

66.5 3,732 thousand tons

Fuel oil

0.0 5.6 thousand tons