Conservation of water resources is an important contribution of the power engineers of OGK-2 JSC to the protection of the environment and the improvement in the regions of the Company’s activities.
Artyom Semikolenov, Managing Director of OGK-2 JSC
OGK-2 operations are directly related to the use of natural resources and the impact on the environment. In this regard, the Company takes measures to minimize the harmful impact on the environment and allocates significant funds to the implementation of relevant measures.
The management of OGK-2 is aware of its responsibility for the state of the environment, environmental risks and the health of the population living in the zone of influence of thermal power plants. OGK-2's sustainable development strategy is based on environmental safety and the parity of economic, social and environmental values.
On November 15–16, 2020, the All-Russian Ecological Dictation was held, aimed at increasing the environmental literacy of citizens of the Russian Federation. 27 people took part from the environmental divisions of OGK-2 JSC.
On August 31, 2020, the Environmental Policy of OGK-2 JSC was updated.
In the reporting year, the branches carried out a large amount of environmental protection measures aimed at protecting atmospheric air, wastewater treatment, waste management, protecting and rehabilitating land, surface and groundwater, and protecting the environment from noise, vibration and other types of physical impact.
Branch of OGK-2 | Events |
Krasnoyarskaya GRES-2 | In 2020, the branch carried out a major overhaul of the internal cyclonic elements of the multicyclone collectors of boilers 7A, 7B, 9A, 9B, fuel supply suction units, repair of oily wastewater treatment facilities. Work was carried out to increase the capacity of the ash disposal area, reduce filtration due to the area of the reclaim sections. In addition, the branch carried out activities aimed at reducing the use of water for industrial needs:
In 2020, work was carried out to stock the Krasnoyarsk reservoir of the Yenisei River basin with Siberian sturgeon juveniles in the amount of 10,896 pieces as part of a restoration measure to compensate for damage caused to aquatic biological resources. |
Novocherkasskaya GRES | For the sake of rational use of water resources, in order to avoid water losses, metrological certification and maintenance of the SIRENA cooling water measuring system were carried out. The branch also takes measures aimed at reducing the use of water for industrial needs, namely the reuse of wastewater from the outlet canal. Traditionally, during the year, volunteer community clean-up days (Subbotnik) were held both in the territory of the enterprise and at the adjacent territory. Also, with the involvement of various public organizations, three Subbotniks were held in the territory of the power engineers’ residential community. At the end of the year, clean-up measures were taken along the banks of the plant’s inlet and outlet canals. As a result, about 64,000 sq. m of the coastal strip were cleaned, and about 10 tons of garbage were removed. |
Pskovskaya GRES | The branch, being a category II negative impact facility, developed and sent a declaration on the impact of the facility on the environment, carried out work on adjustment of the sanitary protection zone design. It is planned to install it by 31.12.2021. In 2020, on the eve of the World Cleanup Day, the power engineers of the branch, together with the students of Dedovichi School No. 2, cleaned the bank of the reservoir on the Shelon River from debris. After the conducted Cleanup Day in September 2020, lessons on the protection of the environment were held for junior schoolchildren of Dedovichi School No. 2. |
Ryazanskaya GRES | In 2020, work was carried out to adjust the design of the sanitary protection zone. It is planned to install it by 31.12.2021. In addition, repair work was carried out at the treatment facilities to partially replace the pipelines of the primary and secondary sedimentation tanks, blowers, sludge pipelines, as well as the repair of sand trap metal structures. Maintenance of the territory of Ryazanskaya GRES, branch of OGK-2 JSC, water intake facilities of the branch in proper sanitary and technical condition Maintenance of the water protection zone of the Pronya River and the coastal protection zone of the Novomichurinskoye reservoir in accordance with the requirements of water legislation In 2020, measures were taken to improve the territory near the memorial plaque in honor of the dead soldiers in the village of Prudki, Pronsky district. Subbotniks were held in April and October 2020. Dozens of power engineers cleaned the territory of the plant, whitewashed trees, removed dry branches, made pruning, and collected fallen leaves. The branch also continues to work on reusing the ash and slag waste. |
Serovskaya GRES | In 2020, the branch carried out work on maintenance of the treatment facilities for storm water and oily wastewater from power unit No. 9, the treatment facilities for household wastewater KOS-600, in order to maintain the design parameters of treatment. Within the framework of the All-Russian Festival of Energy Saving named #BrighterTogether, trade union activists and members of the youth council held a festive event for children of the boarding school in Serov in the flash mob format. Power engineers reminded the children about the rules of energy safety, rational use of electricity, water and the need to respect nature. The personnel of the enterprise took part in environmental clean-up days aimed at maintaining clean condition and improvements in the power engineers’ residential community. |
Stavropolskaya GRES | The branch is taking measures aimed at reducing the use of water for industrial needs, namely, maintaining the operability of turning the blades of the electrical load centers of units Nos. 1–8 to minimize the load of the electrical load centers depending on the water temperature and the unit power, recirculation of c.w. pressure tunnels is used to enable a larger reduction the flow rate of circulating water to power units, the metering units of water consumption are checked in a timely manner, the flow rate of circulating water is regulated by gates on the drainage conduits, depending on the process flow diagrams. |
Troitskaya GRES | At the end of 2020, the branch took measures aimed at protecting the atmospheric air in terms of reducing the fugitive ash emissions, namely: sowing perennial grasses on the ash platforms of the third section of the ash dump, planting trees and shrubs around the second section of the ash dump. 520 kg of waste paper in the amount of 3,120 rubles were collected and transferred for processing. The branch also continues to work on reusing the ash and slag waste. |
Cherepovetskaya GRES | Saving water resources in 2020 amounted to 69.0 million m3 due to the reuse of wastewater in the production cycle. The share of wastewater reuse has reached 74%. 82% increase in wastewater reuse vs. 2019 data. Work is underway aimed at reuse of ash and slag waste as an insulating material for the needs of municipal solid waste landfills. A diving survey of hydraulic structures was carried out, including cleaning in the area of water intake No. 1, water intake No. 2, hydroelectric installation, fish protection structures. In 2020, information about the sanitary protection zone of the branch was entered into the unified state register of real estate. |
Groznenskaya TPP | In 2020, work was carried out to adjust the design of the sanitary protection zone. It is planned to install it by 31.12.2021. On March 13, 2020, a large-scale cleanup activity was held at the branch of OGK-2 JSC – Groznenskaya TPP. The event was attended not only by the station's employees, but also by contractors. During the event, waste was collected and roads were cleared at the power plant and in the surrounding area, including the parking lot. Also, during the cleanup activity, the planting of seedlings of fruit trees was started. During the year, 75 seedlings of apple, pear, cherry, walnut, quince, sweet cherry, plum and hazelnut varieties were planted in the territory of the plant. |
84 employees of the company attended advanced training under the programs “Ensuring environmental safety by managers and specialists of general economic management systems”, “Ensuring environmental safety when working in the field of hazardous waste management”, “Professional training to obtain right to work with 1–4 hazardous class waste.”
Indicator | 2018 | 2019 | 2020 | Change 2020/2019,% |
Current environmental expenditures | 470,924 | 519,799 | 481,978 | -7 |
including: |
|
|
|
|
for protection of water bodies | 242,633 | 235,889 | 229,136 | -3 |
for protection of ambient air | 138,915 | 202,584 | 202,513 | 0 |
for protection of land resources from production and consumption waste | 38,787 | 42,007 | 28,352 | -33 |
for land restoration | 36,489 | 25,690 | 8,120 | -68 |
Payment for environmental services, total, including: | 126,437 | 263,489 | 130,365 | -51 |
for protection of water bodies | 54,750 | 66,841 | 55,673 | -17 |
for protection of ambient air | 11,914 | 22,941 | 14,677 | -36 |
for protection of land resources from production and consumption waste | 35,324 | 43,384 | 23,390 | -46 |
for land restoration | 4,937 | 16,063 | 3,595 | -78 |
Investment in equity that is sent for environmental protection | 984,445 | 16,636 | 25,879 | 56 |
Payment for negative environmental impact | 135,992 | 97,426 | 85,274 | -12 |
including: |
|
|
|
|
for emissions of pollutants into the atmosphere | 18,050 | 12,474 | 12,739 | 2 |
for discharges of pollutants into water bodies | 9,010 | 5,204 | 10,966 | 111 |
for waste dumping | 108,933 | 79,748 | 61,569 | -23 |
Current (operating) costs for environmental protection in 2020 amounted to 481,978 thousand rubles. (less by 7%). In connection with the sale and purchase transaction of Krasnoyarskaya GRES-2 branch of OGK-2 JSC, since 01.10.2020, the current costs of waste management of the facility has not been taken into account. The current costs of land reclamation have significantly decreased, since Novocherkasskaya GRES branch of OGK-2 JSC did not clear the supply canal corridor of the Don River.
During the reporting period, work was carried out for 236 million rubles, within the environmental safety improvement program, including:
including:
Payments for negative impact on the environment decreased by 12% vs. previous year indicators due to a decrease in the actual negative impact on the environment by the branches of OGK-2 JSC a result of their production activities.
The actual negative impact on the environment turned out to be lower than that of the previous year due to a decrease in electricity generation from 54,688 to 44,247 million kW*h (↓ by 19%), delivery of thermal energy from 6,647 to 5,844 thousand Gcal (↓ by 12%). In addition, a decrease in the negative impact is due to a change in the volume of fuel burned: a decrease in the amount of coal burnt from 7,442.3 to 5,151.3 thousand tons (↓ by 31%), the amount of gas burnt from 11,478.4 to 9,732.3 million m3 (↓ by 15%), and the amount of fuel oil from 17.8 to 14.4 thousand tons (↓ by 19%).
In connection with the construction of a new section of the M4 Don highway, excess methane emissions took place when gas was released into the atmospheric air as a result of work on the reconstruction of a part of the main gas pipeline branch of Novocherkasskaya GRES, branch of OGK-2 JSC. Thus, payment for excess emissions has increased.
Payment for excess discharge can be explained by the discharge of insufficiently treated wastewater at Kirishskaya GRES, branch of OGK-2 JSC (the neutralizing tanks only allow adjusting the pH of wastewater). In addition, according to cl. 5 of Article 16.3 of Federal Law No. 7-FZ dd. 10.01.2002 “On Environmental Protection”, since 2020, the coefficient to payment for limit-exceeding impact has increased by 4 times, therefore, payment for discharges in Kirishskaya GRES, branch of OGK-2 JSC, has increased significantly.
At Troitskaya GRES, branch of OGK-2 JSC, payment for limit-exceeding discharge was significantly reduced due to the transfer of household waste water treatment facilities, which, due to dilapidation, failed to provide sufficient treatment, from the village of Troitsk to the City Administration.
Payment for limit-exceeding waste disposal is due to the absence of approved waste disposal limits for Troitskaya GRES within two months in the reporting year.
Gross pollutant emissions into the air decreased, in total, mainly due to a decrease in electricity generation, lower fuel consumption and a change in the balance of burned fuel: reduction in the amount of coal burned from 7,442.3 to 5,151.3 thousand tons (by 31%), the amount of gas burned from 11,478.4 to 9,732.3 million m3 (by 15%), and the amount of fuel oil from 17.8 to 14.4 thousand tons (by 19%).
In addition, the decrease in gross emissions is due to the final decommissioning of coal-fired generating equipment of Serovskaya GRES, branch of OGK-2 JSC.
Limit-exceeding methane emissions at Novocherkasskaya GRES, branch of OGK-2 JSC, is associated with the construction of a new section of the M4 Don highway.
In terms of greenhouse gas emissions in 2020, there is a decrease in the indicator from 34,730,442 to 27,799,178 tons of CO2-equivalent, which is due to a decrease in the generation of electrical and thermal energy, a decrease in the amount of fuel burned.
Branch name | 2018 | 2019 | 2020 | Change 2020/2019,% |
Adlerskaya TPP | 1,420 | 1,020 | 1,119 | 9.75 |
Kirishskaya GRES | 5,729 | 7,502 | 5,096 | -32.08 |
Krasnoyarskaya GRES-2 | 41,358 | 39,384 | 13,690 | -65.24 |
Novocherkasskaya GRES | 109,275 | 82,377 | 70,416 | -14.52 |
Pskovskaya GRES | 78 | 102 | 87 | -14.11 |
Ryazanskaya GRES | 13,984 | 17,678 | 12,121 | -31.44 |
Serovskaya GRES | 507 | 843 | 1,013 | 20.15 |
Stavropolskaya GRES | 6,517 | 3,509 | 2,751 | -21.6 |
Surgutskaya GRES-1 | 15,747 | 14,198 | 11,164 | -21.37 |
Troitskaya GRES | 25,156 | 19,546 | 16,528 | -15.44 |
Cherepovetskaya GRES | 7,420 | 1,737 | 3,515 | 102.4 |
Groznenskaya TPP | -, | 598 | 1,061 | 77.34 |
OGK-2 Totals | 227,192 | 188,494 | 138,561 | -26.49 |
Waste generation decreased by 25.5% due to a 21% decrease in ash and slag waste generation (hereinafter – ASW) due to a reduction in solid fuel combustion.
The presence of waste at the beginning and end of the year at Troitskaya GRES is shown only at facilities located in the Russian Federation (the ash disposal area of the branch is located in the Republic of Kazakhstan, in the territory of the Russian Federation there is only an emergency tank where ash and slag waste can be temporarily placed).
In 2020, the amount of waste used at the enterprise has significantly decreased. In 2019, Novocherkasskaya GRES, branch of OGK-2 JSC, in accordance with the requirements of the approved WGDLB, disposed waste “soil formed during excavation, not contaminated with hazardous substances, sand waste not contaminated”, generated when clearing the corridor of the supply canal and used for filling dams. In 2020, these works were not carried out.
The increase in generation of oil sludge wastes is associated with the pumping of water-oil emulsion from the emergency oil tanks of KTC-1 and KTC-2, its treatment at the unit for treatment of oil contaminated wastewater and sludge formation at Surgutskaya GRES-1, branch of OGK-2 JSC.
Branch name | 2018 | 2019 | 2020 | Change 2020/2019,% |
Adlerskaya TPP | 116 | 105 | 101 | -3.6 |
Kirishskaya GRES | 3,310 | 2,316 | 7,449 | 221.6 |
Krasnoyarskaya GRES-2 | 228,563 | 191,190 | 77,237 | -59.6 |
Novocherkasskaya GRES | 1,053,686 | 922,172 | 677,847 | -26.5 |
Pskovskaya GRES | 145 | 129 | 161 | 25.2 |
Ryazanskaya GRES | 115,040 | 136,973 | 96,138 | -29.8 |
Serovskaya GRES | 514 | 315 | 517 | 64.1 |
Stavropolskaya GRES | 733 | 3,282 | 3,059 | -6.8 |
Surgutskaya GRES-1 | 5,398 | 6,214 | 3,215 | -48.3 |
Troitskaya GRES | 364,977 | 252,620 | 241,602 | -4.4 |
Cherepovetskaya GRES | 36,868 | 6,654 | 26,339 | 295.8 |
Groznenskaya TPP | - | 13 | 72 | 465.6 |
OGK-2 Totals | 1,809,350 | 1,521,983 | 1,133,737 | -25.5 |
ASW makes up 95% of the total amount of production and consumption waste of electric power facilities. ASW has good prospects for widespread use in order to save resources. It should be borne in mind that the gold slack material is a valuable mineral raw material that can be used in metallurgy, the construction industry, in the construction of roads, and agriculture.
Coal generation branches organized work on sale of ASW, developed and received appropriate certificates and technical specifications proving that ash and slag material can be used as a raw material for use in various fields of activity.
In 2020, the following amounts were shipped to suppliers: dry ash – thermal power plant loss – 67.428 thousand tons, ash and slag waste from ash dumps – 271.355 thousand tons and 610 tons of fly ash.
Branch of OGK-2 JSC | Dry ash transferred to other enterprises, tons | ASW from ash dumps transferred to other enterprises, tons | Transferred to other enterprises, fly ash |
Novocherkasskaya GRES | 25,085 | 10,499 | 403 |
Ryazanskaya GRES | 37,077 | 260,856 | - |
Troitskaya GRES | 5,266 | - | 207 |
Cherepovetskaya GRES | - | - | - |
Total for OGK-2 JSC | 67,428 | 271,355 | 610 |
The decrease in the pollutants mass is due to reduced electricity generation compared to 2019, as wastewater disposal to water bodies have also decreased.
The name of indicators | 2019 | 2020 |
Total mass of pollutants discharged into surface water bodies, t, including: | 11,267 | 10,963 |
within VAT | 6,419 | 5,279 |
limit-exceeding | 4,848 | 5,684 |
Total water intake and preparation in the Company decreased. This indicator directly depends on the generation of electricity. In 2020, there was a 19% decrease in electricity generation.
An increase in underground water consumption occurred in Ryazanskaya GRES, branch of OGK-2 JSC, due to the following reasons:
In Surgutskaya GRES-1, branch of OGK-2 JSC, the water consumption for block air conditioners increased due to the early start and late end of the warm period in 2020 (April – October).
Water use and wastewater disposal in 2020 decreased by 22–23%. This indicator directly depends on the generation of electricity and water intake. In 2020, there was a decrease in electricity generation by 19%, as well as a decrease in water intake by 23%.
In addition, in connection with the sale and purchase transaction in relation to Krasnoyarskaya GRES-2, branch of OGK-2 JSC, since 01.10.2020, the environmental impact from the economic activities of this facility has not been taken into account.
In 2020, the disposal of contaminated wastewater to surface facilities was significantly reduced due to the transfer of dilapidated treatment facilities to the City Administration by Troitskaya GRES, branch of OGK-2 JSC, in accordance with a court decision.
Action plan to reduce the negative impact on the environment for 2021–2023:
Implementation period: 2021–2023.
Effect: elimination of discharges of pollutants into the Talitsa river.
Implementation period: 2021–2023.
Effect: automated control of the content of oil products in wastewater, minimization of the risks of pollution of water bodies with oil products.
Implementation period: 2020–2021.
Effect: instrumental control and accounting of the volume of industrial water consumption, optimization of water consumption.
Implementation period: 2021–2023.
Effect: increasing the efficiency of the fish protection structure, minimizing the risk of possible damage to aquatic biological resources.